Sovereign AI infrastructure for Australia

From power to intelligence.

InferaStack connects distributed compute, energy and networks into sovereign AI capacity. One energy-aware control plane matches workloads to qualified Australian sites.

Distributed infrastructureCompute · energy · network · sites
InferaStack AI GridQualify · admit · schedule
Gateway + AI workloadsRequest · policy · record

Our ecosystem

What we build

Proof of concept · technical validation

InferaStack AI Grid

Energy-aware, distributed AI compute for qualified Australian sites.

  • Designed around solar, storage and grid limits
  • Site qualification and admission
  • Local and central monitoring

Next milestone Workload evaluation and site qualification

Private preview

InferaStack Gateway

One interface for model requests, policy and usage records. Private preview for invited applications.

First integration InferaCard's AI bios, headshots and intro reels.

Architectural rendering of Highlife Morningside’s landscaped communal rooftop terrace.
Architectural rendering

First pilot site

Highlife Morningside, Brisbane

Highlife Morningside is planned as the first pilot site for InferaStack AI Grid, using NVIDIA systems for distributed AI compute.

Target: first half of 2027, after site acceptance.

Highlife sustainability design

Applied AI, delivered for ACIA

ACIA owns and operates InferaNote and InferaCard. InferaStack provides the AI layer on AWS.


Why InferaStack

Energy-aware

Site power is planned before compute.

Sovereign and auditable

Location and access agreed per workload.

Client-controlled

Your dedicated hardware and model choice.

Measured before scale

Each step tested before the next.


How to work with us

Dedicated GPU deployment

For government, councils and health services

An Australian GPU environment you own and govern.

  • Workload-led design
  • Measured acceptance before handover
See how deployments work →

InferaStack AI Grid capacity

After qualification

Register interest in reserved capacity across qualified sites.

  • In technical validation
  • Workload and site acceptance first
Register capacity interest →

Have power, fibre and space? Discuss a site →

Talk to InferaStack

Tell us about your workload or site.

An asterisk marks required fields.

Your details

Include the country code if overseas.

Your enquiry

Start with one workload

Talk to us